ReorderSheet

Reorder point calculator

Find out at which stock level to reorder a product, how much safety stock to hold and by when the next order has to go out. Free, no signup, works for any store.

30 to 90 days is a good window. Average daily sales: 2.0

Extra days of sales kept in stock for late deliveries or a busy week.

Reorder point
42 units

Place the next order when stock falls to this level.

Average daily sales
2.0
Demand during lead time
28
Safety stock
14
Suggested order quantity
60
Stock lasts
–
Order by
–

Doing this for 200 SKUs?

ReorderSheet runs this calculation for every product in your Shopify store at once, from the order and inventory CSV exports you already have. You get a list of what to reorder, how many units and when each SKU runs out, plus the cash tied up in dead stock. $29 once, runs in your browser, files are never uploaded.

See an example report   How it works

The reorder point formula

Reorder point = average daily sales × lead time + safety stock

The first part covers what you sell while you wait for the delivery. Safety stock covers the days when sales run higher than usual or the supplier is late. Once stock on hand drops to the reorder point, the next order goes out, and in theory the delivery arrives just as the safety stock starts to be used.

Two ways to set safety stock

Buffer days is the practical method: decide how many extra days of sales you want on the shelf.

Safety stock = average daily sales × buffer days

Service level is the statistical method. It sizes the buffer by how much your daily sales swing and how often you are willing to sell out.

Safety stock = Z × standard deviation of daily sales × √lead time

Z is 1.28 for a 90% service level, 1.65 for 95%, 1.96 for 97.5% and 2.33 for 99%. Going from 95% to 99% raises safety stock by about 40%, so reserve high service levels for bestsellers.

Worked example

A product sold 60 units in the last 30 days, so 2 units a day. The supplier needs 14 days. You want 7 buffer days.

With 40 units on hand you are already below the reorder point and should order today. With 70 units on hand stock lasts 35 days, and the order has to go out within 14 days (when 42 units are left).

How much to order

The reorder point tells you when to order. For how much, a simple rule is to cover the days until your next regular order: average daily sales × days to cover, plus whatever you are short of the reorder point. Minimum order quantities and case packs from your supplier come on top.

Getting the numbers from Shopify

Common mistakes